Welcome Guest
 
  SubscribePhoto Gallery
Major Achievements
 
  • The power surplus in the state is being sold outside the state through a trading company which facilitates additional revenue.
  • Integration of Sikkim in the Transmission Network of the Eastern Region has been achieved with the commissioning of 132 KV lines from Rangit to Melli and construction of 132/66 KV 100 MVA Substation at Melli.
  • Effective measures are being taken to reduce both the technical and the non-technical losses, especially the non-technical losses by introducing Energy Audit by proper monitoring on all feeders and at distribution transformerlevel to identify high loss areas. The augmentation and strengthening of sub-transmission and distribution system will reduce technical losses.
  • The Diesel Power House at Gangtok was upgraded to 4 MW from the previous capacity of 1.7 MW in 1998.
  • 60 MW Rangit Hydel project in West Sikkim was commissioned in 1999.
  • 2 MW Kalez Khola power project in Dentam in West Sikkim and 3 MW Rabomchu power project in North Sikkim were commissioned in 1995-96 and 1998, respectively.
  • 132 KV transmission line from Rangit to Melli was completed in 2006. Construction of similar transmission lines from Sagbari, Gyalshing to Pelling and Ravangla is currently under execution.Another 132/66 KV sub station LLHP near Gangtok has been commissioned.
  • By 2010, all the 22 power projects of the state will be completed. From these projects the Government of Sikkim will get12 % of free power. This is likely to meet the power shortfall in State and will generate lot of revenues.
  • The state will be earning Rs. 600 crore revenue from these projects.
  • 100 % of the jobs generated in these power projects are being given to the local people depending upon their qualifications. All works which can be carried out by local contractors are being given to them.
Navigation  
 
 
  NLCPR
 
  R-APDRP
 
 
 
Site Map of Hydel Project
 
 
Introduction :
 

The Project area is located at about 350 m upstream of Teesta Kalikhola confluence on NH-31A and 18.3 km downstream of Teesta Bridge near Teesta Bazar village in District Darjeeling. The NH 31A connects the state of Sikkim with the rest of the country via Siliguri. The nearest rail head is New Jalpaiguri and nearest airport is Bagdogra. It is a run of the river scheme with diurnal storage for peaking purpose. The estimated annual energy generation is 720 MU in a 90% dependable year.

 
 
Layout Plan :
 
 
 
SALIENT FEATURES :
 
  Location Kalijhora, darjeeling (W.B)
  Approach 25 Kms from Siliguri town.
  Capacity 160 MW (4x40 MW)
  Annual Generation 720 MUs ( 90% dependable year)
  Project Cost Rs.1061.38 Crores at March 2005 P.L.
  Year of Commissioning/Completion Schedule August 2011 (Anticipated)
 
 
TECHNICAL FEATURES :
 
  45 m high dam(above deepest Foundation level)/Roller Compacted Concrete Dam.
  Surface Power House at Left Bank with 4 units of 40 mw each Kaplan turbine.
  Pressure Shaft: 4 Nos., 7m dia each,Circular shaped; steel lined.
   
 
  • To get your Bill alongwith the Print Out...Click here
  • To receive your Bill at your e-mail...Click here
  • To receive your Bill at your Mobile...Click here
  • Under Departmental Process
  • Under Departmental Process
  • To calculate your tariff...Click here
    © Copyright Notice | Privacy Statement | Feedback & Suggestion | Disclaimer | Contact Us
    All Right reserved by the Energy & Power Department, Government of Sikkim
    Site Designed & Powered by SDS SOLUTION