  • The power surplus in the state is being sold outside the state through a trading company which facilitates additional revenue.
  • Integration of Sikkim in the Transmission Network of the Eastern Region has been achieved with the commissioning of 132 KV lines from Rangit to Melli and construction of 132/66 KV 100 MVA Substation at Melli.
  • Effective measures are being taken to reduce both the technical and the non-technical losses, especially the non-technical losses by introducing Energy Audit by proper monitoring on all feeders and at distribution transformerlevel to identify high loss areas. The augmentation and strengthening of sub-transmission and distribution system will reduce technical losses.
  • The Diesel Power House at Gangtok was upgraded to 4 MW from the previous capacity of 1.7 MW in 1998.
  • 60 MW Rangit Hydel project in West Sikkim was commissioned in 1999.
  • 2 MW Kalez Khola power project in Dentam in West Sikkim and 3 MW Rabomchu power project in North Sikkim were commissioned in 1995-96 and 1998, respectively.
  • 132 KV transmission line from Rangit to Melli was completed in 2006. Construction of similar transmission lines from Sagbari, Gyalshing to Pelling and Ravangla is currently under execution.Another 132/66 KV sub station LLHP near Gangtok has been commissioned.
  • By 2010, all the 22 power projects of the state will be completed. From these projects the Government of Sikkim will get12 % of free power. This is likely to meet the power shortfall in State and will generate lot of revenues.
  • The state will be earning Rs. 600 crore revenue from these projects.
  • 100 % of the jobs generated in these power projects are being given to the local people depending upon their qualifications. All works which can be carried out by local contractors are being given to them.
Navigation  
 
 
  NLCPR
 
  R-APDRP
 
 
 
Site Map of Hydel Project
 
 
Introduction :
 

Teesta Low Dam Project-III was entrusted to NHPC on 15th Nov. 2000. It is located on river Teesta in district Darjeeling of West Bengal.  The nearest railhead is New Jalpaiguri and nearest airport is Bagdogra.  The Project will generate 594.07 MU annually in 90% dependable year. 

 
 
Layout Plan :
 
 
 
SALIENT FEATURES :
 
  Location On river Teesta in Darjeeling distt. (W.B)
  Approach Nearest Rail Head - New Jalpaiguri & Nearest Airport - Bagdogra.
  Capacity (4x33) MW or 132 MW
  Annual Generation 594.07 MU (90% dependable year)
  Project Cost Rs.768.92 Crores (Net) (Dec 2002 price level)
  Year of Commissioning/Completion Schedule February 2011 (Anticipated)
 
 
TECHNICAL FEATURES :
 
  32.5 m high barrage
  125x22x56 m surface power house
  4 nos.kaplan turbine of 33 MW each
   
 
  • To get your Bill alongwith the Print Out...Click here
  • To receive your Bill at your e-mail...Click here
  • To receive your Bill at your Mobile...Click here
  • Under Departmental Process
  • Under Departmental Process
  • To calculate your tariff...Click here
    © Copyright Notice | Privacy Statement | Feedback & Suggestion | Disclaimer | Contact Us
    All Right reserved by the Energy & Power Department, Government of Sikkim
    Site Designed & Powered by SDS SOLUTION