  • The power surplus in the state is being sold outside the state through a trading company which facilitates additional revenue.
  • Integration of Sikkim in the Transmission Network of the Eastern Region has been achieved with the commissioning of 132 KV lines from Rangit to Melli and construction of 132/66 KV 100 MVA Substation at Melli.
  • Effective measures are being taken to reduce both the technical and the non-technical losses, especially the non-technical losses by introducing Energy Audit by proper monitoring on all feeders and at distribution transformerlevel to identify high loss areas. The augmentation and strengthening of sub-transmission and distribution system will reduce technical losses.
  • The Diesel Power House at Gangtok was upgraded to 4 MW from the previous capacity of 1.7 MW in 1998.
  • 60 MW Rangit Hydel project in West Sikkim was commissioned in 1999.
  • 2 MW Kalez Khola power project in Dentam in West Sikkim and 3 MW Rabomchu power project in North Sikkim were commissioned in 1995-96 and 1998, respectively.
  • 132 KV transmission line from Rangit to Melli was completed in 2006. Construction of similar transmission lines from Sagbari, Gyalshing to Pelling and Ravangla is currently under execution.Another 132/66 KV sub station LLHP near Gangtok has been commissioned.
  • By 2010, all the 22 power projects of the state will be completed. From these projects the Government of Sikkim will get12 % of free power. This is likely to meet the power shortfall in State and will generate lot of revenues.
  • The state will be earning Rs. 600 crore revenue from these projects.
  • 100 % of the jobs generated in these power projects are being given to the local people depending upon their qualifications. All works which can be carried out by local contractors are being given to them.
Navigation  
 
 
 
Hydel Projects in Sikkim
   
Site Map of Hydel Project
 
 
Consumption Calculator
You may roughly calculate the consumption for your connection on the basis of the load of each one of your household appliances by looking at the table given below and adding up the load for all your general lighting items, heating appliances, cooling appliances and other items which you may possess in your house.
This tool will assist you in seeing where you can reduce usage and improve energy efficiency in your home.
1000 W (watts) is 1KW (kilowatt).
 
         
Appliances Approximate Load (Watts) No. of Equipments Average Hours/Day Approximate Units/Month
 
General Lighting
Lamps (Bulb) 40
Lamps (Bulb) 60
Lamps (Bulb) 100
Lamps (CFL) 11
Lamps (CFL) 22
Tube Lights 40 
Heating Appliances
Electric iron 600- 1000
Immersion heater 1500
Water heater/Geyser 1000- 2000
Toaster 750
Cooling Appliances
Refrigerator (165 liters ) 200
Window air -conditioner 
( 1.5 ton)
1500 -2000
Desert cooler ( medium) 200
Room cooler 60 -200
Table fan/ceiling fan 60-100
Exhaust fan 150
Other Items
Washing machine 700
Radio 40
Television 200
Mixer-cum-grinder 200
Computer 200
Pump motor (Half HP) 370
Pump motor (1 HP) 740
Pump motor(1.5 HP) 1110
         
    Total Monthly Consumption:
 
   
  • To get your Bill alongwith the Print Out...Click here
  • To receive your Bill at your e-mail...Click here
  • To receive your Bill at your Mobile...Click here
  • Under Departmental Process
  • Under Departmental Process
  • To calculate your tariff...Click here