Accelerated Power Development and Reform Programme (APDRP) Schemes
in Sikkim
Utilities/State
Electricity Boards all over India have been found to be losing crores of
rupees in transmission and distribution losses annually because of old and
deteriorated lines, overloading of the 11 KV systems, distribution
transformers and low tension lines. Besides this, theft of power, technical
and commercial losses made all the SEBS and Electricity Departments run in
tremendous losses and it could not be checked unless some new method is
conceived to prevent the losses.
Hence the Ministry of Power, Government of India, launched APDRP under the
supervision of Ministry of Power, Government of India.
AT &
C Loss Reduction in the State of Sikkim:
|
Year |
AT & C Loss (%) |
% age Reduction |
|
2001.02 |
57.18 |
|
|
2002-03 |
53.46 |
3.72 |
|
2003.04 |
53.07 |
0.39 |
|
2004.05 |
43.63 |
9.44 |
|
2005.06 |
39.75 |
3.88 |
|
2006.07 |
36.50 |
3.25 |
|
2007-08 |
33.00 |
3.50 |
|
2008-09 |
29.00 |
4.00 |
Sub-circle wise AT & C Loss Reduction (%):
|
Year |
North |
Gtk-I |
Gtk-II |
East |
LLHP |
South |
West |
Total |
|
2001-02 |
82.64 |
42.41 |
45.68 |
46.16 |
53.14 |
61.58 |
68.64 |
57.18 |
|
2002-03 |
80.11 |
41.54 |
43.57 |
40.01 |
49.01 |
59.14 |
60.81 |
53.46 |
|
2003-04 |
79.64 |
40.67 |
44.78 |
38.87 |
48.78 |
58.20 |
60.57 |
53.07 |
|
2004-05 |
70.99 |
28.94 |
38.15 |
28.05 |
40.18 |
47.08 |
52.04 |
43.63 |
|
2005-06 |
63.18 |
27.72 |
34.17 |
27.05 |
33.10 |
41.00 |
52.01 |
39.75 |
|
2006-07 |
59.00 |
25.00 |
32.00 |
25.00 |
29.00 |
37.50 |
48.00 |
36.50 |
|
2007-07 |
56,50 |
21.00 |
28.00 |
21.00 |
26.00 |
34.50 |
44.00 |
33.00 |
|
2008-09 |
53.00 |
16.00 |
24.00 |
16.00 |
22.00 |
31.00 |
41.00 |
29.00 |
Status of APDRP Schemes:
Sikkim has committed itself towards the reformation and improvement of the
existing sub transmission and distribution system (ST & D) by modernising
the infrastructure developed since its inception. In this regard, the state
has already entered into a Memorandum of Agreement with the Ministry of
Power, Government of India, for time bound programme of improving its ST & D
network through APDRP. The basic objective of the programme is to reduce the
techno-commercial losses and increase revenue realisation along with
improvement in voltage profile and reduction in outages so as to provide
quality and reliable power to the consumers at affordable rates.
A number of schemes have been formulated in order to achieve operational
efficiency and effective load management. The state has also launched the
ambitious programme of 100% metering right from the 66 KV sub station level
up to the consumers premises. This time bound programme aims at rigorous
energy auditing thereby reducing pilferage of energy at each voltage level
and making the utility self-sustainable and economically viable so as to
create an environment for private sector participation in sub transmission
and distribution area.
|
GENERAL ABSTRACT OF APDRP SCHEMES |
|
|
|
|
|
|
|
|
Rupees in lakh |
|
SlNo |
Name of the Project |
Estimated cost |
Sanction by GOS |
Sanction by GOI |
Fund released by GOI |
Budgetary provision ( State Plan) |
Fund released under State Plan |
Total Fund Released |
Shortfall |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9=(6+8) |
10=(4-9) |
|
1 |
APDRP Metering, Phase -III |
583.00 |
583.00 |
583.00 |
583.00 |
0.00 |
0.00 |
583.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
2 |
APDRP S/W & LLHP ST&D Improvement |
1417.00 |
1417.00 |
223.00 |
223.00 |
0.00 |
0.00 |
223.00 |
1194.00 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
APDRP ST & D improvement |
5542.00 |
5542.00 |
5542.00 |
5542.00 |
0.00 |
0.00 |
5542.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
4 |
APDRP supplementary project for ST& D improvement |
9934.00 |
9934.00 |
9125.00 |
9125.00 |
0.00 |
0.00 |
9125.00 |
809.00 |
|
|
|
|
|
|
|
|
|
|
|
|
5 |
APDRP( 2005-06) |
3955.00 |
1724.00 |
0.00 |
0.00 |
1946.00 |
0.00 |
0.00 |
1724.00 |
|
|
|
|
|
|
|
|
|
|
|
|
6 |
APDRP ( 2006-07) |
0.00 |
0.00 |
0.00 |
0.00 |
800.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Grand Total |
21431.00 |
| |