DETAILS OF SPILL OVER LIABILITIES UNDER NLCPR/ NEC ETC AND DETAILS OF RESOURCES .

ENERGY AND POWER DEPARTMENT
Year 2008-09
   
 

    

    

    

    

    

    

    

    

    

    

    
Sl No Name of Scheme NLCPR/Central Support 90% fund received from GOI 10% funding from Loan from GOS Total fund received till 31.3.08 Fund received during 2007-08 (90+10)% Cumulative Expenditure incurred till 31.03.2008        (Provisional) Spill over  fund to be utilized during2008-09 for which fund is already available Fund received during 2008-09 (90+10)% Total fund which would  be available on receipt of balance fund from GOI Balance fund to be received from GOI Budget Provision 2008-09 Gross resource released Net resource released
1 2 3 4 5 6=4+5+6(a) 6(a) 7 6-7=8 9 10 3-7-8-9-=11 12 13 14
1 Communication and data Exchange pertaining to SLDC (NLCPR) 974.16 809.00 40.00 974.16 125.16 954.29 19.87   19.87 0.00 1.00    
2 66 KVDC transmission Lines from LLHP to Bulbuley (NLCPR) 1561.56 1276.00 21.00 1297.00 0.00 1297.00 0.00   0.00 264.56 1.00    
3 Remodelling of T&D network in Gangtok             ( NLCPR) 2244.40 2109.96 134.44 2244.40 0.00 2229.32 15.08   15.08 0.00 1.00    
4 66KV sub statation to Chungthang  ( NLCPR) 683.99 630.59 53.40 683.99 0.00 649.90 34.09   34.09 0.00 100.00    
5 132 KV Transmission Lines from Sagbari Gyalsing Pelling Ravongla (NLCPR) 2303.15 1522.15 79.44 2303.15 701.56 2199.45 103.70   103.70 0.00 1.00    
6 Const. of 132 KV TL from 132 KV PGCIL's SS LLHP to Sherathang near Nathula (NLCPR) 3100.87 907.80 100.87 1008.67 0.00 1008.67 0.00   0.00 2092.20 1300.00    
7 Synchronization of Rimbi Stage I modernization Rimbi stage I, Rimbi II  & Kalez (NLCPR) 962.32 303.13 33.68 673.62 336.81 693.26 -19.64   -19.64 288.70 288.70    
8 Upgradation & conversion of Existing dedicated 3.3 KV system into 11KV system of Gangtok NEC 318.00 135.00 15.00 261.11 111.11 260.63 0.48   0.48 56.89 56.89    
9 Extension of one 66KV Bay at 66/11 Switchyard at Gyalshing and construction of 66/11 KV,1*5 MVA ss at Sardung ( Yangthang) in West Sikkim NEC 429.11 90.00 10.00 429.11 329.11 96.16 332.95   332.95 0.00 429.11    
10 Design, supply Erectio, Testing Commission of 2*3.5 MVA 3.3/66 KV Switchyard cum substation at Rongli HEP together Construction of one 66 KV line Bay for Rongli HEP to Sundung in East Sikkim. NEC 425.63 90.00 10.00 425.63 325.63 425.63 0.00   0.00 0.00 1.00    
11 Interconnection of 11 KV Development Area SS with 11/11 KV TNA sub Station as part of Ring Main Network, Gangtok. NEC 101.74 45.00 5.00 101.74 51.74 101.66 0.08   0.08 0.00 1.00    
12 Remodelling and augmentation of HT & LY Power supply and Distribution system at Pakyong Bazar East Sikkim NEC 228.00 0.00 0.00 111.11 111.11 49.89 61.22   61.22 116.89 178.00    
13 Remodelling of Existing Distribution System of MG Road and its surrounding areas, Gangtok NEC 451.00 0.00 0.00 222.22 222.22 199.85 22.37   22.37 228.78 251.00    
  GRAND TOTAL 13783.93 7918.63 502.83 10735.91 2314.45 10165.71 570.20 0.00 570.20 3048.02 2609.70 0.00 0.00

Contributed by :
C.A.O.,  Energy & Power   Department