MAJOR
ACHIEVEMENTS IN POWER SECTOR

§
The power surplus in the state is being sold outside the
state through a trading company which facilitates additional revenue.
§ Integration
of Sikkim in the Transmission Network of the Eastern Region has been
achieved with the commissioning of 132 KV lines from Rangit to Melli and
construction of 132/66 KV 100 MVA Substation at Melli.
§ Effective
measures are being taken to reduce both the technical and the non-technical
losses, especially the non-technical losses by introducing Energy Audit by
proper monitoring on all feeders and at distribution transformer level to
identify high loss areas. The augmentation and strengthening of
sub-transmission and distribution system will reduce technical losses.
§ The
Diesel Power House at Gangtok was upgraded to 4 MW from the previous
capacity of 1.7 MW in 1998.
§ 60
MW Rangit Hydel project in West Sikkim was commissioned in 1999.
§ 2
MW Kalez Khola power project in Dentam in West Sikkim and 3 MW Rabomchu
power project in North Sikkim were commissioned in 1995-96 and 1998,
respectively.
§ 132
KV transmission line from Rangit to Melli was completed in 2006.
Construction of similar transmission lines from Sagbari, Gyalshing to
Pelling and Ravangla is currently under execution. Another 132/66 KV sub
station LLHP near Gangtok has been commissioned.
§ By
2010, all the 22 power projects of the state will be completed. From these
projects the Government of Sikkim will get12 % of free power. This is likely
to meet the power shortfall in State and will generate lot of revenues.
§ The
state will be earning Rs. 600 crore revenue from these projects.
§ 100
% of the jobs generated in these power projects are being given to the local
people depending upon their qualifications. All works which can be carried
out by local contractors are being given to them.
|